PunchSoldiers kill terrorist, rescue six family members in Sokoto, ZamfaraESPNSources: Rams' Garrett faces 6-week recovery, may be out until NovemberBollywood HungamaYour favourite TV serials could return in 90-second episodes! Agent Raghav, Fear Files, Santoshi Maa enter microdrama spaceThe Jerusalem PostTerrorist used child to transfer weapons into civilian home in Gaza, IDF footage revealsInquirerMarcos meets with Eastern Visayas troops; lauds security, peace effortsUOLMissão nipo-europeia se prepara para chegada a MercúrioDaily MailWhy recollections may vary (again): ROBERT HARDMAN investigates Earl Spencer's most shocking allegations... as friends reveal how Charles really reacted to Diana's death - and why suggestion late Queen loved Johnny Spencer is madVilaWebEl Sindicat de Llogateres anuncia una acció sorpresa a Barcelona, coincidint amb la visita de SánchezCBS NewsSeveral arrested, bomb disposal deployed near air base used by U.S. forcesMyJoyOnlineTenth woman’s body found as South Africa police probe killingsObservador DesportoSete detidos em Sintra por apedrejarem políciasRai NewsIl Papa a Lourdes chiede perdono per gli abusi e ricorda che "stampelle e lacrime non sono ostacoli"
The Daily Newsstand · Free, Always
Sunday, September 27, 2026

Visayas grid under yellow alert on September 27, 2026 --NGCP

Translate

Make this your preferred source to get more updates from this publisher on Google.

Power outages may occur as the Visayas grid will be placed under yellow alert for four hours on Sunday, September 27, due to the unavailability of some coal plants, the National Grid Corporation of the Philippines (NGCP) said.

In an advisory, the NGCP said the yellow alert declaration will take effect from 5 p.m. to 9 p.m.

The grid currently has an available capacity of 2,519 megawatts (MW), while the peak demand is 2,342 MW.

The yellow alert status declaration is due to the unavailability of Visayas' large coal plants: Panay Energy Development Corporation Unit 3, KEPCO SPC Power Corporation Unit 2, and Therma Visayas Inc. Unit 1. The said plants were shut down at 4:34 a.m.

There’s also a deration in Leyte due to tripping of several units, the NGCP said.

Meanwhile, 10 plants are on forced outage in September, three plants since August, two plants since June, six plants since May, three plants since 2025, two plants since 2024, two plants since 2023, and one plant since 2021. There are also 17 plants running on derated capacities, for a total of 974.4MW unavailable to the grid.

A yellow alert is issued when the operating margin is insufficient to meet the transmission grid’s contingency requirement.

To address the thinning energy reserves in the Visayas grid, the Department of Energy (DOE) earlier ordered the NGCP to install over 250 megawatts of battery energy storage system.

The DOE is also mulling to tap liquid fuel facilities to help power up the grid. —KG, GMA News

View the original on GMA News →

KioskNews shows a cleaned-up reading view extracted from the publisher’s page — the original always lives on their site, not ours.