Daily MaverickPAYMENT MODELS: Riding the e-commerce buy now, pay later hype train while it lastsInquirerMove It accountability, rider protection sought after P555.75M penaltyThe Jerusalem PostTrump: Monsey, NY Jews should vote 'in big numbers' for Lawler, he 'fights against antisemitism'ZDF heuteAktuelle Pressemitteilungen des ZDFRolling StoneDon’t Want to Give Fox News Your Money? Here’s How to Stream It for FreeCBS NewsControl of Congress on the line as voters decide midterms — live updatesGlobal News‘Very important’ evidence in Florida plane crash found miles from site: NTSBNOSOpnieuw duizenden Tsjechen de straat op tegen hervorming publieke omroepCNN بالعربيةإليسا تعلن تمردها على "الترندات والأرقام" في ألبومها المُرتقب "أليسار"Premium TimesADC warns Sokoto govt, vows to hold governor responsible for intimidation, violence against oppositionSRF NewsChampions League, 4. Spieltag – Yamal und Manzambi auffällig: Barça schlägt Aston Villa verdientESPNThe Heisman race is wide open once again: How Week 10 could change everything
The Daily Newsstand · Free, Always
Tuesday, November 3, 2026

Bullet Train Connectivity To Guwahati Approved: Himanta Biswa Sarma

Translate

In a major revelation of the Centre's ambitious project to link New Delhi to the landlocked Northeast through bullet trains, Assam Chief Minister Himanta Biswa Sarma on Tuesday welcomed the approval given to include Guwahati, stating that several technical and logistical details regarding the project are yet to be worked out.

Speaking on the development, the Chief Minister said that the approval to bring the bullet train to Guwahati was the first major positive development, but the project would require several stages, including surveys and the construction of a completely separate railway line.

Sarma said the biggest challenge would be crossing the strategically sensitive Siliguri Corridor, popularly known as the Chicken's Neck, which connects the Northeast with the rest of the country.

He pointed out that the corridor is only around 22 kilometres wide in certain stretches, with some patches measuring just 16 kilometres. With an existing National Highway and railway line already passing through the narrow corridor, the government would have to explore whether the bullet train track could be constructed underground or overground.

The Chief Minister also clarified that bullet trains cannot operate on existing railway tracks and would require an entirely separate railway corridor.

He said the project would involve substantial investment, potentially two to three times higher, depending on the technology and construction method adopted to cross the Chicken's Neck.

READ | 280 kmph, 8 Coaches, 557 Passengers: What Will India's 1st Bullet Train Offer

Sarma further revealed that the proposal had initially faced difficulties, but following his discussions with Railway Minister Ashwini Vaishnaw and his request to Prime Minister Narendra Modi, approval was eventually granted to extend the proposed bullet train connectivity to Guwahati.

The Chief Minister said he would hold further discussions with the Railway Minister during his next visit to Delhi to understand the technical details and the proposed alignment.

Describing the approval as a significant decision for Assam and the Northeast, Sarma credited Prime Minister Narendra Modi and Railway Minister Ashwini Vaishnaw for the development.

He, however, maintained that the approval was only the first step, with the detailed planning, technology selection, survey and execution strategy yet to be finalised.

View the original on NDTV →

KioskNews shows a cleaned-up reading view extracted from the publisher’s page — the original always lives on their site, not ours.