וואלהרוכב אופנוע כבן 30 נהרג בתאונה בכביש 50 בירושליםESPNArsenal's aura of champions evaporates after Brighton thrash them 3-0PunchPHOTOS: Police raid FCT crime hotspots, arrest 300 suspectsESPN DeportesSunderland responde cada golpe del CityThe Jerusalem PostOnly 17% of Israelis, 21% of Palestinians believe peaceful coexistence is possible, poll findsInquirerManila suspends in-person classes Sept. 21 over Martial Law anniv rallyRTP DesportoÀ conquista da Torre. Milhares de ciclistas em evento na Covilhã한겨레‘최악에서 최고 사령탑’ 반전 마즐스 감독…시스템 농구에 선수 응집력 폭발UOLVeja o resultado da Mega-Sena concurso 3060 deste domingo (20)ConsequenceEd Sheeran Says He Considered Canceling Tour, Felt Abandoned After Macklemore ControversyBBC SportVan beats Pantoja to retain UFC flyweight titleIl Fatto QuotidianoProf accoltellata a scuola, si indaga su chi ha postato online il video dell’aggressione e sui partecipanti della videochiamata su Telegram
The Daily Newsstand · Free, Always
Sunday, September 20, 2026

First car of third NSCR trainset arrives at Valenzuela depot

Translate

Make this your preferred source to get more updates from this publisher on Google.

The first of eight cars of the third eight-car electric multiple unit (EMU) trainset for the Malolos–Tutuban segment of the North-South Commuter Railway (NSCR) has arrived at the Malanday Depot in Valenzuela City, the Department of Transportation (DOTr) said.

The remaining seven cars are expected to arrive at the depot within the coming week, completing the third trainset.

The third batch of eight-car EMU trainsets arrived from Japan in August, according to the DOTr.

The DOTr targets the start of operations of the Valenzuela–Malolos, Bulacan segment of the NSCR by December 2027. Full operations from Clark, Pampanga to Calamba, Laguna are expected by the third quarter of 2033.

The 147-kilometer NSCR project will have 35 stations connecting Central Luzon, Metro Manila and Calabarzon.

The DOTr projects that the railway will cut travel time between Clark and Calamba from about four hours to two hours.

The NSCR is expected to serve 800,000 commuters daily once fully operational, the DOTr said.— MCG, GMA News

View the original on GMA News

KioskNews shows a cleaned-up reading view extracted from the publisher’s page — the original always lives on their site, not ours.